Mon – Fri 8:30–17:00
Map

SMD INSTALLATION

The sequence of SMD operations includes:
  • The manufacture or purchase of printed circuit boards (multi-procurement);
  • Application of solder paste to the contact pads of the board;
  • Ustanovka komponentov na pechatnuyu platu; 40/5000 Installation of components on the PCB;
  • Melting in the furnace;
  • The output of their furnace reflow.
More

LED PRODUCTION

The LED production site is:
  • More than 50 units of automated machines and other equipment;
  • Quality materials from Germany, Japan and China;
  • Multi-level air cleaning and ventilation system;
  • Grounding jobs and tools;
  • Highly qualified team of engineers and operators.
More

ASSEMBLY

The assembly site includes the following operations:
  • Wire harness, insulating cambric;
  • Installation of LED strip;
  • Assembly;
  • Control of functioning;
  • Packaging;
  • Printing labels labels.
More

SEALING

Stages of sealing:
  • Preparation and labeling of LED strips;
  • Fill;
  • Drying;
  • Heat shrink tubing;
  • Scotch tape on tape;
  • Check the operation of LED strips.
More

FUNCTIONAL TESTING

Measurements of light devices are divided into:
  • Installation and testing of the product;
  • Setup of measuring equipment;
  • Teplovaya stabilizatsiya; Thermal stabilization;
  • Measurement process;
  • Registration of the measurement protocol, product disassembly;
  • Climatic tests of products for storage and operation conditions;
More

QUALITY CONTROL

Quality control includes:
  • Input quality control of components;
  • intermediary control;
  • Control of finished products;
  • Periodic testing;
More